On July 28, Dr. Wang Haishan, chief expert
and chairman of JCC, and
other experts and his party visited Chifeng prefabricated building green
industrial park in Inner Mongolia (hereinafter referred to as "Industrial
Park"). Zhao Tong, deputy director of Hongshan District, Chifeng City,
Inner Mongolia; Sun Jian, general manager of Hongshan state owned assets
company; Wang Fenglin, President of North times Design Institute, etc. The two
sides visited the assembly building factory in the industrial park and had an
in-depth exchange on the development status and future development direction of
the prefabricated industry in Chifeng City. Li Yukun, deputy general manager of JCC, Gao Chunfeng, director of
prefabricated construction project, Li Ang, technical manager of R & D
center, accompanied the investigation.
Assembly Building Green Industrial Park in
Hongshan District of Chifeng City integrates design, production and
construction. In terms of design, Chifeng City's earliest company to carry out
prefabricated construction, North times architectural design group, is located
in the park. Chifeng City has unique factor endowment advantages in the
development of prefabricated construction industry. Firstly, the planning area
of the industrial park is more than 2000 mu, which is in the first echelon of
the existing similar industrial parks in China; secondly, it has a high
positioning, which is constructed according to the highest domestic quality
standard and European SYSPRO HiQ standard, with complete supporting facilities;
thirdly, it is rich in raw material resources and cement sand stone resources
Fourth, the industrial chain is complete, from investment and development,
survey and design to production and construction, the enterprise development
foundation is good, the technical quality of labor force is high, there are one
super class, 17 first-class and hundreds of excellent industrial chain
enterprises; fifthly, Chifeng is ushering in the second wave of urban
construction climax, the urban population is expanding from 1.2 million to more
than 2 million, and a large number of local projects will be accelerated Sixth,
the location advantage is obvious. The nearest place is more than 200 kilometers
away from Beijing. The high-speed railway is open to traffic this year, and it
takes 1.5 hours to Beijing. This makes it fully able to undertake the relief of
Beijing's construction industrialization capacity and provide high-quality
building components, components and installation services for Beijing, Tianjin
and Hebei.
In terms of production, the industrial park
has property company, Cloud Computing Center, logistics center of refuge area,
etc., and its business involves infrastructure construction, municipal
administration, construction waste recycling project, landscaping, development
company, wool trading, flower market, medical supplies, etc.; in terms of
construction, there is Chifeng Hongji group with assembly construction capacity
in Hongshan District, Can be integrated construction.
At the exchange meeting, in view of the
future development direction of Chifeng prefabricated buildings, Dr. Wang
Haishan, chairman of JCC, put forward several suggestions. For example, according to the
existing conditions of Chifeng City, the construction of prefabricated
buildings needs to be refined in all aspects. First of all, it is necessary to
carry out full-term planning, including how to do in the initial, medium and
long-term; secondly, it is necessary to think about how to plan and build green
building materials; finally, the relevant government needs to provide
supporting policy planning, and relevant enterprises need to carry out relevant
technical planning and supporting, understand the local standards and the
development direction of prefabricated buildings, and operate steadily on the
existing basis After the corresponding production capacity, the relevant work
will be carried out gradually. For example, northern times Design Institute, as
an excellent design enterprise in the industry, needs to adjust the relevant
standards according to the new European system.
Experts at the meeting suggested that
Chifeng prefabricated building industrial park should introduce the most
advanced assembly building component production technology in the world --
German automatic production line, so as to improve the efficiency and
manufacturing quality. The two sides reached consensus on the technology, standard
and equipment of prefabricated building.
Chifeng municipal government attaches great
importance to the development of the construction industry. In mid August this
year, Chifeng will hold this year's "chizi summit", inviting people
of Chifeng nationality from all over the country to return to their hometown to
share their hometown feelings, gather wisdom, share resources and jointly
promote development. This year, JCC and Chifeng construction industry association will jointly host the
construction and transportation industry conference. You are welcome to attend.